Process Chiller Sizing from GPM and Delta T

Updated

To estimate the cooling load already carried by a water loop, measure its flow and temperature rise across the process at the same steady operating condition. The result is heat removed from the process, not the chiller’s electrical input. Use it to request a capacity rating at your actual operating temperatures.

Calculate the water-side load

For pure water, using US gallons per minute and degrees Fahrenheit:

Cooling load (BTU/h) ≈ 500 × flow (US GPM) × temperature rise (°F)

Divide BTU/h by 12,000 to get refrigeration tons. For example, 32 US GPM flowing through a process with a 9°F rise gives 500 × 32 × 9 = 144,000 BTU/h, or 12 refrigeration tons, approximately 42.2 kW of thermal cooling. A refrigeration ton is a rate of heat removal, not a weight or a motor power rating. Trane’s chilled-water guide explains the water-side heat balance and refrigeration tons. Conair gives a practical example of measuring flow and temperature change for an existing process.

For pure water in metric units, the equivalent approximation is 0.0697 × flow (L/min) × temperature rise (K) ≈ thermal kW. A temperature difference of 1 K equals a difference of 1°C. These constants approximate water properties; they are not suitable for an unspecified glycol mixture. For glycol, tell the supplier the type, concentration and operating temperatures so the calculation uses the fluid’s applicable density and specific heat.

Take readings that belong together

Measure flow through the process being assessed, and record the water temperature entering and leaving that process. Subtract the entering temperature from the leaving temperature. Record all three values together after operation has settled, with the production rate and equipment running at the time. A temperature difference from one condition and flow from another do not describe the same load. When the temperature rise is small relative to sensor uncertainty, record sensor accuracy and check matched measurements before treating the difference as real.

Repeat at the highest sustained production condition and at other meaningful operating states. Note intermittent loads, startup and planned additions separately: a steady snapshot does not capture every peak. If a shared loop serves several machines, identify which flow and temperatures represent the combined load; do not add individual estimates to a whole-loop measurement of the same loads.

Ask for capacity at the actual duty

The calculated load is not automatically the nameplate size to buy. Chiller output varies with operating conditions, and nominal tons alone do not establish available capacity at your temperatures. Give suppliers the calculated duty and discuss peaks, fouling, future loads and any reserve explicitly; there is no single margin that fits every plant.

Put the same item in each request Ask each supplier to state
Required thermal load Available cooling capacity at the specified duty, in kW or refrigeration tons
Fluid and flow Water or glycol type and concentration, process flow and allowable pressure drop
Chilled-fluid temperatures Required leaving-chiller temperature and return temperature at that flow
Condenser conditions Design ambient air temperature for an air-cooled unit, or entering condenser-water temperature and flow for a water-cooled unit
Operating range Minimum and peak load, cycling or turndown limits, and treatment of intermittent loads
Electrical and installation scope Electrical input at the stated duty, power supply, pumps, controls and any separate heat-rejection equipment

Compare the quoted capacity and electrical input as different figures, under the same conditions. If the equipment type is still undecided, see chillers vs temperature control units; for condenser utilities, see air-cooled vs water-cooled chillers. The RFQ checklist helps document the rest of the installation.