A useful request for quotation (RFQ) describes the material, the job and the conditions under which the equipment must work. It also asks suppliers to state what is included and how performance will be checked. Send the same information to each supplier so that differences in their proposals are visible.
Download the blank RFQ checklist as CSV. Open it in a spreadsheet editor and fill in the fields relevant to your project. Leave unknown values blank and identify them as questions for suppliers. The file is a working aid; Machinery Lane does not collect your entries or submit an RFQ for you.
Describe the material and the job
Name the material and grade if known, its form, and any additives or regrind. Include the range of material to be handled, not just the easiest material. Note dust, contamination restrictions and the frequency of material changes. For drying, include the material supplier’s target conditions and the inlet condition if known; do not assume one setting fits every resin.
Explain the process, equipment already in use and the outcome needed. Give normal and peak throughput with units, operating hours and expected variation. For conveying, identify sources, destinations, route lengths and elevation changes. Conair’s central receiver manual notes that receivers and pumps are matched to throughput and conveying distance.
Give the site conditions
Provide the available electrical supply and relevant utilities, space and access constraints, and the installation location. For cooling or temperature control, describe the available cooling supply and required process temperatures. Tell suppliers about interfaces with existing machines and any required site standards. Ask qualified site personnel to confirm the information and assess the proposed installation; the checklist is not an installation procedure.
For a mould temperature unit, the operating temperature alone is not enough. Regloplas identifies the heat-transfer fluid, heating and cooling capacities, pump flow and pressure, and operating voltage as relevant specifications. Its mould guidance also relates the mould and process conditions to equipment selection.
Make proposals comparable
Ask for the proposed model and configuration, included accessories, utilities and any exclusions. Request performance at your stated conditions and identify assumptions or missing data. If a material trial or factory test is needed, agree on the sample, test conditions, measurement method and acceptance criteria. A catalogue maximum is not necessarily a result at your operating point.
Separate equipment price from freight, installation, commissioning, training and ongoing support where applicable. Ask about lead time, warranty, spare parts and local service. Clarify who supplies and coordinates each part of the work, and keep revisions so every supplier prices the same scope.
Find relevant companies
Use the drying, conveying and feeding, and cooling and temperature control directories to identify companies to research. Conair and REGLOPLAS are examples with equipment in these areas. Check the company’s own product and service information for your application and location before contacting it.
Download the CSV checklist and fill in the details relevant to your equipment enquiry.
Download the RFQ checklist CSVThe CSV could not be downloaded. Please try again.