Beside-the-Press vs Central Granulators

Updated

A granulator’s location changes how scrap reaches it, who handles it and how regrind is kept separate. Start with the route from each press to the next use of the material, then choose a machine for the actual parts. “Beside the press” and “central” describe arrangements, not a guaranteed rotor speed or capacity.

Trace the scrap route

A machine-side arrangement can receive runners or rejected parts near the press, using a chute, robot or conveyor where appropriate. A central arrangement moves scrap to a shared location before granulation. That journey needs containers or conveying, identification and a destination for the resulting regrind. Draw both routes, including where material waits during breaks and changeovers.

Check Beside the press Central location
Input route Match the chute, robot or conveyor to the hopper Plan collection, transport and safe loading
Separation Identify material at each station Keep batches identified through collection and processing
Changeover Clean the local feed and discharge path Include shared containers, feed path and collection system
Service Allow access beside the operating cell Allow access for maintenance and incoming scrap

A location label does not settle the machine choice. Conair lists its 17 Series for both central and machine-side recycling. WITTMANN also describes its G-Max XL as suitable for either position. Compare the intended configuration and part, not just the catalogue category.

Match the largest input and feed method

Record the largest runner or part, including dimensions, wall thickness, material and whether pieces can nest together. Provide photographs or samples to the supplier. The opening must accept the part in its actual orientation, and the machine must process the proposed feed without bridging or overloading. Average kilograms per hour alone does not answer either question.

Feed height and space matter too. WITTMANN’s granulator guide shows different hopper arrangements for a robot, conveyor and slide chute. Conair describes its S Series for metered robot or conveyor feed beside small injection machines. These are examples of configurations, not a rule that all machine-side units use the same cutting speed or feed arrangement.

Plan separation and changeovers

List which resins, colours and grades must remain separate. At a shared granulator, label the scrap container and the regrind container as well as the batch; decide who checks the labels at each transfer. At a press, check whether the discharge route can accidentally connect to another material. Reuse must follow the plant’s material and quality rules.

Ask the supplier to show which surfaces, screens, collection bins and conveying lines need cleaning when the material changes. Estimate changeover time with the people who will do the work, and leave room to open and service the equipment. A convenient location on a layout drawing can become inconvenient if a hopper or chamber cannot be accessed.

Questions for a supplier

  • What are the largest and heaviest individual pieces, their material and the expected hourly rate and peak feed pattern?
  • Will scrap arrive continuously, in batches or through a robot or conveyor? What feed height and available space apply?
  • How will each material be identified and kept separate before and after cutting?
  • Which parts require access for cleaning, knife service and removal of a blockage?
  • Can the supplier assess representative samples and confirm the proposed feed and discharge arrangements?

If the scrap is too large or difficult to feed, compare the options in granulator vs shredder. Browse size-reduction companies or use the RFQ checklist to prepare the enquiry.

Sources

Related categories

Related companies

Related guides